Nanjing International Youth Cultural Centre by Zaha Hadid Architects

Nanjing International Youth Cultural Centre

The Nanjing International Youth Cultural Centre harnessed the energy of the 2014 Youth Olympic Games to create a project with a lasting legacy that has enhanced and also regenerated its setting – acting as both an anchor and a catalyst for future investment in Nanjing’s Hexi New Town.

Comprised of two hotel towers that include the new Jumeirah Nanjing, a cultural centre with conference facilities, an urban plaza, offices and mixed-use areas. Now the centre has fostered investment in Hexi New Town on multiple levels; integrating additional infrastructure with new functions that include the hotels and a venue for Jiangsu Province’s annual conferences.

Some of these functions, such as the footbridge connecting the city to the rural landscapes of Jiangxinzhou Island in the Yangtze River, are expressed. Others, such as burying the existing expressway below ground to create a new riverside park, are now hidden.

The four elements of the cultural centre (conference hall, auditorium, shops and guest zones) are independent volumes surrounding the central courtyard. The conference hall seats 2,100 and is equipped with a multi-purpose proscenium stage suitable for conferences, cultural and theatrical events. The auditorium seats 500 and is optimized for acoustic performances.

The cultural centre’s design is a three dimensional calligraphic composition that resonates with Nanjing’s 1,600-year-old tradition of Yunjin – the name given to the intricate brocade threading used by local craftsmen to weave the region’s acclaimed gold and silver fabrics. Like Yunjin thread, a continuous line interweaves throughout the cultural centre connecting it with its earthquake-resistant towers and beyond to the new central business district, riverside park and Jiangxinzhou Island.

The tapering profiles of the towers, at 255m and 315m Zaha Hadid Architects’ tallest completed towers to date, extend the viewer’s sense of perspective. The towers’ trapezoidal floor plans maximise their river-facing frontages and double-decked elevators increase the efficiency of their core area planning by fifty per cent. The cross-sectional geometry of the towers ensures an average net to gross ratio of over 70 per cent.

High standards in the quality and performance of the centre’s interior environments are achieved by bringing natural light into the deep plan spaces of the conference centre and minimising the need to augment daylight by avoiding tinted glass. Office spaces combine mechanical and natural ventilation which, along with high level gardens, enhance the user experience.

Efficient cooling and heating strategies, optimal passive design orientation, flexible planning and self-cleaning facades are used to maximise the project’s design life. Driven by the milestone of the 2014 Youth Olympic Games, for which the development provided venues and competitors’ accommodation, the centre’s construction operations set
records and demonstrated the project team’s expertise.

Mainland China’s first completely top-down/bottom-up tower construction, combining above and below ground construction with extensive design work proceeding in parallel, the project’s construction programme was reduced by a full year. The entire centre was completed 34 months after design began with all works on site lasting only 18 months.

The Nanjing International Youth Cultural Centre’s architecture is defined by its location at the intersection of an important urban axis and the Yangtze River. With its popular 2,100-seat theatre and the new Jumeirah Hotel, the Nanjing International Youth Cultural Centre has been a vital catalyst for investment in Hexi New Town’s civic infrastructure: an excellent legacy of the 2014 Youth Olympic Games. Source by Zaha hadid Architects.

Photo © Hufton+Crow
  • Location: Nanjing, China
  • Architect: Zaha Hadid Architects
  • Design: Zaha Hadid, Patrik Schumacher
  • ZHA Project Director: Nils-Peter Fischer
  • ZHA Consulting Associate: Cristiano Ceccato
  • ZHA Project Architect: Shao-Wei Huang
  • ZHA Lead Facades & Envelope: Shao-wei Huang, Lydia Kim
  • ZHA Lead Conference Centre: Melike Altinisik
  • ZHA Lead Towers & Podium: Garin O’Aivazian
  • ZHA Lead Interiors: May-Jinqui Qin
  • ZHA Lead Landscape & Urbanism: Carolina Lopez-Blanco
  • ZHA Lead Site Supervision: Ed Gaskin
  • ZHA Competition Team: Garin O’Aivazian, Jalal El-Ali, Kyla Farrell, Maria Tsironi, Matthew Richardson, Melike Altinisik, Meng Chan Tang, Mirco Becker,
  • Mostafa El Sayed, Paolo Gamba, Saman Saffarian, Shajay Bhooshan, Shaowei
  • Huang, Shyamala Duraisingam, Spyridon Kaprinis, Suryansh Chandra, Yevgeniya Pozigun
  • ZHA Project Team: Alexandros Kallegias, Ashwin Shah, Carlos Michel-Medina, Carlos Piles Puig, Chao Wei, Charbel Chagoury, Christy Yin, David Doody, Duarte Reino, Elena Scripelliti, Emma Chen, Ermis Chalvatzis, Eugene Leung, Frenji Koshy, George Frenji, Ho-Ping Hsia, Hongdi Li, Igor Pantic, Jamie Mann, John Randle, Julia McLeod, Katharina Hieger, Konstantinos Mouratidis, Leonid Krykhtin, Leo Wu, Mattia Gambardella, Michael Grau, Michael Sims, Mostafa El Sayed, Mu Ren, Nassim Eshaghi, Natassa Lianou, Nicholette Chan, Niqui Berkowski, Patryk Ruszkowski, Sebastian Andia, Shajay Bhooshan, Soomeen
  • Hahm, Spyridon Kaprinis, Vincent Nowak, Yuchen Zhang, Yue Shi, Yun Zhang 
  • ZHA Site Supervision Team: Juan Liu, David Chen, Liyuan Zhang, Vincenzo Cocomero, Xi Wang, Xin Ji, Yan Geng
  • Architect of Record: China Architecture Design and Research 
  • Group
  • Structural Engineer: BuroHappold Engineering, China Architecture Design and Research Group
  • MEP Engineer: BuroHappold Engineering, China Architecture Design and Research Group
  • Vertical Transportation Consultant: Dunbar and Boardman
  • Façade Engineer: BuroHappold Engineering
  • Landscape Architect: SWA Group
  • Lighting Consultant: Brandston Partnership Ltd
  • Acoustics Consultant: Zhejiang University, China
  • Theatre Consultant: China Art and Technology Institute
  • Main Contractor: China State Construction Engineering Corporation Division 8, China State Construction Engineering 
  • Corporation Division 3
  • Client: Hexi New Town Planning Bureau
  • GFA incl Basements: 465,000 m2
  • Year: 2018
  • Photographs: Hufton+Crow, Jumeirah Hotel, Courtesy of Zaha Hadid Architects

Leave a Reply