MANUFACTURING TECHNOLOGY OFFICE BY BROOKS + SCARPA

Brooks + Scarpa

Site: A 100,000 square foot vacant parcel located within a new Research and Technology Innovation Park developed by the Mexican government. The site is also adjacent to the Monterrey, Mexico airport and adjoins a natural habitat area.

Brooks + Scarpa
Program: A 55,000 square foot research lab, office and industrial testing facility serving an automotive industry client who designs and manufactures automotive and heavy truck chassis. The first phase encompasses a total of 15,500 square feet, including 5,500 square feet of office space and 11,000 square feet of research labs and warehouse space for testing and developing prototypes. The second phase consists of an additional 5,500 square feet of office space and 34,000 square feet of research labs and warehouse space.
Brooks + Scarpa
Solution: Industrial buildings are rarely a place that anyone is happy to visit or work. They are typically a direct, and often nefarious programmatic response to the function inside with little consideration for the occupants needs. The approach to this project was to preserve the integrity of a high bay industrial facility and program, while providing a model environment for the users and visitors.
Brooks + Scarpa
A saw-toothed roof draws from the geometry of old factories and the surrounding Monterrey Mountains. The angled elements of the roof provide abundant natural daylight to the spaces below at the building’s northernmost elevations. By modulating space and light thru a fractured roof geometry, the building is able to maintain a rational plan to meet the rigorous requirements of the program, while providing a strong connection to the landscape both visually and metaphorically.
Brooks + Scarpa
The second major feature of the building is the perforated metal skin that clads the entire façade. Manufactured by the client in their auto manufacturing facility nearby, the custom aluminum skin is both perforated and etched. It incorporates interplay of solid and void, orchestrating areas of both light and shadow, while limiting views into the research areas, necessary to protect proprietary trade secrets.
Brooks + Scarpa
Thus, the industrial program has been transformed from a black box environment to a light filled space with a strong visual connection to the outside. Each of these strategies and materials, exploit the potential for performance and sensibility while achieving a rich and interesting sensory and aesthetic experience.
Brooks + Scarpa
Programmatically, the building is divided into two volumes – warehouse/labs and offices functions. The upper story of the offices cantilever over the lower story to the west and is clad in a highly perforated metal skin and is the main entry facade. The lower story is mainly glazed and open to reveal portions of the research laboratory, machine room and other industrial functions not requiring visually security.
Brooks + Scarpa
From the exterior, the warehouse appears to float lightly over the mechanical and intellectual heart of the program, reversing the notion that an industrial building should be solid and protected. Rather, the building seems very open and is intended to feel vulnerable revealing parts of its inner program to public view.
Brooks + Scarpa
The main entry of the building is located at the northwest corner under the cantilevered volume. It is flanked by a sunken garden to the north, which is overlooked by the surrounding offices. The garden is a natural bioswale that connects to the adjacent water reclamation wetland for the entire PITT campus.
Brooks + Scarpa
A large industrial overhead door located off the entry in the main public space opens to the garden outside. The facility is anticipated to be Mexico’s first new construction LEED Platinum building.
Brooks + Scarpa
Brooks + Scarpa 
Brooks + Scarpa
Brooks + Scarpa 
Location: Apodaca, Mexico 
Project Team: Daniel Poei, Abby Katcher, Oliver Liao, Darien Williams, Jordan Gearhart, Ching Luk 
Landscape: PEG 
Structural Engineering: Carl W. Howe Partners 
Mechanical, Electrical and Plumbing: Cobalt 
LEED: Zinner Consultants 
Area: ~500 m2 Offices, ~1000 m2 Warehouse (Phase 1) + ~500 m2 Offices, ~3000 m2 Warehouse (Phase 1)  
Year: 2013

Leave a Reply

Your email address will not be published. Required fields are marked *