The University of Southampton’s Boldrewood Innovation Campus was recently opened by Her Royal Highness, The Princess Royal in an official ceremony. The 4.3 hectare site places the university at the forefront of maritime research through the co-location of the Southampton Marine and Maritime Institute and research facilities supporting the Faculty of Engineering and the Environment with Lloyd’s Register’s Global Technology Centre.

Boldrewood Innovation Campus
Photo © Jim Stephenson

This unique collaboration ensures students and researchers have access to real life case studies while Lloyd’s Register engineers have access to cutting-edge research. The £140m scheme is Grimshaw’s largest European university project to date and it includes the overall master plan and design of all buildings on the site. Currently, four buildings have been completed and occupied: one for Lloyd’s Register and three for the university.

Boldrewood Innovation Campus
Photo © Jim Stephenson

The latter includes a hydro science facility which accommodates a 138m towing and wave tank, two large wind tunnels (one of them anechoic) together with water flumes for the detailed study of fluid dynamics. Entrances to these buildings face a sloping lawn, in the centre of an open space that will be clearly defined at the heart of the campus when the final building, a new National Infrastructure Laboratory, is completed in 2018.

Boldrewood Innovation Campus
Photo © Jim Stephenson

With interdisciplinary collaboration at the heart of the brief, great care was taken to find the most appropriate way to facilitate this through the architectural design. The southernmost university building shares a podium with the Lloyd’s Global Technology Centre, uniting the two organisations with a Maritime Institute designed specifically for collaborative projects.

Boldrewood Innovation Campus
Photo © Jim Stephenson

Both Lloyd’s and the university buildings also share the concept of a central atrium with acoustic properties conducive to speech, coupled with easily accessible and generous accommodation stairs. The palette for the four buildings includes Jura limestone, used principally around podium elements, zinc cassette panels, terracotta baguettes, anodised aluminium, glass and cedar boarding.

Boldrewood Innovation Campus
Photo © Jim Stephenson

Simple detailing is demonstrated in the configuration of external shading, which has only been introduced where necessary to create a shading pattern appropriate to each elevation. On east and west facades the louvres are vertical, on south facades they are horizontal, and on north facades they have been dispensed with altogether.

Boldrewood Innovation Campus
Photo © Jim Stephenson

Interior details of the Lloyd’s building are emblematic of the activity within. There is a striking plate-steel cantilevered ‘ship’s stair’ within the atrium with yacht deck timber treads and landings. The marine theming of the staircase complements the “ship’s hull” expression of the zinc clad, U-shaped floorplates that surround it. Several aspects of current best practice in the sustainability field have been employed in buildings throughout the campus.

Boldrewood Innovation Campus
Photo © Jim Stephenson

These include night-time thermal storage through exposed concrete soffits, options for both natural and low velocity displacement ventilation, and minimisation of solar gain through appropriate external shading. An innovative, low-energy rain water filtration system was also pioneered on the Lloyd’s Register building, the first time such a system has been used on this scale. All four university buildings are exclusively lit by LED fittings, the first buildings of their kind to do so in the UK. Source by Grimshaw.

Boldrewood Innovation Campus
Photo © Jim Stephenson

Location: Southampton, United Kingdom
Architects: Grimshaw
Year: 2015
Photographs: Jim Stephenson, Courtesy of Grimshaw